Pilot 3 – Collaborative Procurement

Key elements to be demonstrated

·      Delivery of multiple sites across multiple clients and local authority areas.

·      Adoption of the EHD Design & Performance Standard

·      Adoption of the EHD housing typologies

·      Adoption of an Alliance Agreement or equivalent

·      Collaboration around procurement and a new business model

 

‘Pilot 3 bundled twelve pipeline sites over five Local Authorities within the Edinburgh and South East Scotland City Region. A feasibility commission has been undertaken to de-risk projects within the pipeline, embed the regional design standards and typologies, promote collaboration, and embed value.

The resulting feasibility reports identified five sites within three local authorities that were suitable for development. The sites have now been procured appointing a single Contractor using existing framework options and are now in pre-construction phase.

Pilot 1

Granton D1 is a delivering of 75 homes using Modern Methods of Construction that will be monitored once occupied.

Pilot 2

Greendkes K&L is a delivering 140 homes using multiple Modern Methods of Construction systems.